Access
Roof + loft access
- Loft hatch accessible
- Any locked side gates opened
- Safe access to meter location
A quick checklist that reduces design assumptions and follow‑ups.
Use this for homeowner comms or internal prep. We’ll still confirm scope before booking — this is the “usual wins” list.
Delivery: pack + organised photos are available in the portal immediately upon completion of the visit.
Small prep → fewer questions later. If you have documents, have them ready — photos of paperwork are fine.