Skip to main content
Installer guide

Energy surveys for installers: what good looks like

Installer teams lose momentum when survey outputs are hard to use. A strong survey process removes ambiguity before design starts.

15,000+ surveys completed across UK installer workflows · Pack and organised photos available in the portal immediately on completion of the visit · EPC by next morning in the standard flow.

What to capture before design starts

What strong looks like

Capture standards

  • Decision-ready photos grouped by route, access, and constraints
  • Measurements linked to design assumptions, not left as isolated notes
  • Clear callouts for anything still needing confirmation
  • A repeatable pack structure office, design, and install teams all recognise
Old way cost

Where teams lose time

  • Quote delays while teams chase missing context
  • Design friction caused by uncertain assumptions
  • Install-day surprises from incomplete handoff evidence
Vertex workflow

Why teams use Vertex

  • Cleaner office-to-design handoff
  • Faster first-pass quoting with less chasing
  • Install teams start with clearer site context
  • Portal visibility across teams and roles

Related pages and proof